Featured Projects
Past Projects
CARDIAC CATHETER LABORATORIES AND CARDIOTHORACIC WARD, UCHG
This project entailed the strip out of the Coronary Care Unit in UHG and re-planning in order to provide two Cardiac Catheter laboratory suites for use as a Cardiothoracic Ward. This included all enabling and associated works. It included the maintenance of existing live services, the strip out, demolition and alteration works at the beginning…
CONSERVATION & REFURBISHMENT PISCATORIAL SCHOOL GALWAY
Following a successful tender for the refurbishment and conservation works to the Piscatorial School in the Claddagh, Carey’s are delighted to be involved in the sensitive restoration, extension and upgrade works to the historical building dating from 1846. The works included; Demolition of an external steel escape stairs to the rear of the building Restoration…
TEMPLE ST HOSPITAL WARD REFURBISHMENT DUBLIN
We were successful in our Tender for the project in Temple St Hospital which includes a Bridge Link extension and refurbishment works at St Philomena’s ward which is on the 1st floor level of the Hospital. The project entailed the following: Forming an opening in the existing floor to form a lift well The removal…
IDA BUILDING FIT OUT FOR NUIG
This project consisted of the re-configuration and fit out of an existing 3 storey Building located in the IDA Business Park in Dangan, Newcastle, Galway. It included the installation of additional lab benching in the Laboratory and change of use of small labs for alternative use.
COPE (MODH EILE) HOUSE GALWAY
Carey Building Contractors have been successful in their tender for the proposed renovation of the Magdalen Laundry Building in Galway. The Building was gifted to COPE Galway by the Mercy Order for a new refuge. Works have commenced on site. Modh Eile is a new home for Cope Galway’s Domestic Abuse Service. The new Building…
MERIT MEDICAL ‘VISION’ PROJECT
Client: Merit Medical Ireland Project Description: This project entailed the construction and fit out of a new 75,000sqft Medical Device Manufacturing Facility comprising of cleanrooms, sterile preparation areas, controlled environment Research and Development facility and laboratories, together with fit out of the new European commercial HQ including integrated AV system, training and warehouse facility. In…
St MICHAEL’S COLLEGE AILESBURY RD
Client: St Michaels College – Refurbishment & Fire Remediation Works Replacement of existing Ceiling to Assembly Hall Installation of Acoustic Wall linings Installation of new lighting layouts including design of the required electrical infrastructure Overhaul of the existing Stage Area including new access door, works to existing floor, steps, stage flats, proscenium arch and stage…
MOUNT TEMPLE COMPREHENSIVE SCHOOL
Client: Mount Temple Comprehensive School Project Description: Mount Temple Comprehensive School required emergency external Works to be undertaken during the Summer Break to be compliant with the TGD Part M – Access and Use. These Works included the construction of 3 no. external access ramps, repair and replacement of surface car parking. We successfully submitted a…
TRIBESMAN BRIDGE REPLACEMENT NUIG
Client: National University of Ireland Galway Project Description: This project entailed the removal and replacement of the existing Tribesman footbridge serving the NUIG Rowing Club. Initial enabling works included the set-up of a safe system of working to ensure that all health and safety measures were established prior to commencement of Works. This included Working…
NEW FIRE STATION TUAM CO GALWAY
Client: Galway Fire and Rescue Service, Galway Co Council Project Description: This project involved the construction of a new 2 storey Fire Station on a greenfield site with all associated site works. It involved the construction of a Four Appliance Bay Building with ancillary accommodation and training facilities to include a 5 storey training tower…