We were successful in our Tender for the project in Temple St Hospital which includes a Bridge Link extension and refurbishment works at St Philomena’s ward which is on the 1st floor level of the Hospital.
The project entailed the following:
- Forming an opening in the existing floor to form a lift well
- The removal of existing windows
- The demolition of internal load bearing and non-load bearing block walls
- The demolition of external walls to existing W.C. to allow for construction of extended utility
This is a live acute hospital environment with patient occupied wards above and below the site area which is located at first floor level. The dense City Centre location required a detailed logistics strategy in order to provide the smooth running of the site and deliveries.