Project Description:
This project entailed the refurbishment of the existing neonatal unit in the Maternity Dept at UHG. The building required re-planning (including demolitions), the renewal of the fabric roof covering, the replacement of windows, dry-lining and insulation of external walls. A new fire escape was installed at ground level. All works took place in a heavily trafficked area to the front of the main hospital building.
Value: €1.8m
Completed October 2011